Metal

Specifications for Metal Roof Installations
Worry-Free
Professional Roofing System
Ten (10) Year Workmanship Warranty

1. Set-up Family Safe Clean Up Procedure.
2. Remove existing roof & haul away debris.
3. Prepare roofing surface by removing perimeter-protruding nails & re-nailing any loose wood.
4. Arrange & schedule for a termite inspection.
5. Trim existing starter board to align with fascia.
6. Install 1/2” sheathing or 1” solid fill-in per city building codes.
7. Install earthquake reinforcement straps at ridge rafter joints.
8. Install (2) Two layers of TILE ROOF GUARD secured to the entire deck with 1” plastic cap nails.
9. Install galvanized metal pipe vent cap flashings as needed.
10. Install drip edge metal around perimeter of roof.
11. Install metal/clay bird-stop (profile, eave riser (flat) or starter tile (as indicated)
12. Install 24” valley. Pan, chimney & counter flashings as needed (26 gauge metal)
13. Install & properly nail all new field tiles.
14. Install primary (dual) pipe flashings: aluminum (profile) galvanized (flat) as needed.
15. Install nail board for hip, ridge & rake including separate water barrier.
16. Install color coordinated mortar as needed.
17. Install & properly fasten hip, ridge & rake trim tiles along with custom and treatments.
18. Seal all joints & cracks around pipe jacks, vents & openings with polyurethane sealant.
19. Seal all pipe & vent joint and flashings with polyurethane sealant.
20. Paint all vents & pipes to closely match roof (using rust resistant paint).
21. Perform Family Safe Clean-Up Procedure.
22. Complimentary membership into The Roof Protection Plan for one (1) year.

Specifications for Metal Roof Installations
Worry-Free
Up-Graded Roofing System
Fifteen (15) Year Workmanship Warranty

1. Set-up Family Safe Clean Up Procedure.
2. Remove existing roof & haul away debris.
3. Prepare roofing surface by removing perimeter-protruding nails & re-nailing any loose wood.
4. Arrange & schedule for a termite inspection.
5. Trim existing starter board to align with fascia.
6. Install 1/2” sheathing or 1” solid fill-in per city building codes.
7. Install earthquake reinforcement straps at ridge rafter joints.
8. Install LEAK BARRIER (PEEL & STICK) membrane in high risk areas of roof (valleys, pipes, vents, chimneys, skylights, rake to wall & roof to wall joints)
9. Install (2) Two layers of TILE ROOF GUARD secured to the entire deck with 1” plastic cap nails.
10. Install secondary galvanized pipe flashings as needed.
11. Install drip edge metal around perimeter of roof.
12. Install metal/clay bird-stop (profile), eave riser(flat) or starter tile (as indicated)
13. Install 24” valley, pan, chimney & counter flashings as needed (26 gauge metal)
14. Install Worry-Free ridge & soffit ventilation system as needed.
15. Install and screw fasten first two courses of perimeter tile, &nail fasten all other field tiles.
16. Install primary (dual) pipe flashings: aluminum (profile) galvanized (flat) as needed.
17. Install nail board for hip, ridge & rake including separate water barrier.
18. Install color coordinated mortar as needed.
19. Install & properly fasten hip, ridge & rake trim tiles along with custom and treatments.
20. Seal all pipe & vent joints and flashings with polyurethane sealant.
21. Paint all vents & pipes to closely match roof (using rust resistant paint).
22. Perform Family Safe Clean-Up Procedure.
23. Complimentary membership into The Roof Protection Plan for two (2) years.

Specifications for Metal Roof Installations
Worry-Free
SUPERIOR ROOFING System
Twenty (20) Year Workmanship Warranty

1. Set-up Family Safe Clean Up Procedure.
2. Remove existing roof & haul away debris.
3. Prepare roofing surface by removing perimeter-protruding nails & re-nailing any loose wood.
4. Arrange & schedule for a termite inspection.
5. Trim existing starter board to align with fascia.
6. Install 1/2” sheathing or 1” solid fill-in per city building codes.
7. Install earthquake reinforcement straps at ridge rafter joints.
8. Install LEAK BARRIER (PEEL & STICK) membrane in high risk areas of roof (valleys, pipes, vents, chimneys, skylights, rake to wall & roof to wall joints)
9. Install SUPERIOR rubberized membrane secured to the entire deck with 1” plastic cap nails.
10. Install secondary galvanized pipe flashings as needed.
11. Install drip edge metal around perimeter of roof.
12. Install metal/clay bird-stop (profile), eave riser(flat) or starter tile (as indicated)
13. Install 24” valley, pan, chimney & counter flashings as needed (26 gauge metal)
14. Install Worry-Free ridge & soffit ventilation system as needed.
15. Install and screw fasten all new field tiles.
16. Install primary (dual) pipe flashings: aluminum (profile) galvanized (flat) as needed.
17. Install nail board for hip, ridge & rake including separate water barrier.
18. Install color coordinated mortar as needed.
19. Install & properly fasten hip, ridge & rake trim tiles along with custom and treatments.
20. Seal all pipe & vent joints and flashings with polyurethane sealant.
21. Paint all vents & pipes to closely match roof (using rust resistant paint).
22. Paint visible replacement wood as needed (customer to supply paint).
23. Install spark-arrestors on all chimneys (if needed)
24. Perform Family Safe Clean-Up Procedure.
25. Complimentary membership into The Roof Protection Plan for three (3) years.